A kitchen has to work hard and look right doing it. We plan the layout around how you cook and gather, then build it properly, from what’s behind the walls to the last cabinet pull.

The room with the most moving parts

More trades pass through a kitchen than any other room in the house, and most of what matters ends up hidden: what’s in the walls, the floor under the cabinets, the way the lighting is wired. That’s why we start with a walkthrough and look past the finishes before we price anything.

Some kitchens need a refresh: new counters, cabinet fronts, lighting and paint. Others need a new layout, a wall opened up or a room rebuilt from the studs. Either way, you see the scope in writing before work starts, and the order of work is planned so you’re without a kitchen for as little time as we can manage.

A renovated kitchen with sage green cabinets, a wood island and hardwood floors.

What a kitchen renovation can include

Every kitchen is different. These are the pieces that come up most.

  • Layout and flow

    Where the sink, range and fridge sit, how people move between them, and whether an island or a peninsula earns its space.

  • Opening up the room

    Taking down or widening a wall where the structure allows, with the framing and support it needs.

  • Cabinets and storage

    New cabinets or refaced ones, pantry space, and storage planned around what you actually keep.

  • Counters and backsplash

    Stone, quartz, solid surface or butcher block, with tile or slab behind.

  • Lighting

    Overhead, under-cabinet and pendant lighting planned together, so the room works at six in the morning and at dinner.

  • Floors and finishes

    Flooring, trim, paint and hardware, finished to match the rest of the house or to set the kitchen apart.

The stages that matter in a kitchen

Every renovation runs through the same twelve stages. A full kitchen renovation touches most of them; the ones picked out are where a kitchen usually spends its time.

  1. 1Before
  2. 2Cleared out
  3. 3Framing
  4. 4Mechanical
  5. 5Inspection
  6. 6Insulation (not usually part of this job)
  7. 7Drywall
  8. 8Paint
  9. 9Flooring
  10. 10Kitchen
  11. 11Lighting
  12. 12Finished

How a project runs

Questions about kitchens

The ones we hear most. Anything else, ask.

Can we keep using the house while the kitchen is out?

Usually, yes. Most people set up a temporary kitchen elsewhere in the house. We’ll plan the order of work so the time without a working kitchen is as short as we can make it, and tell you up front how it’s likely to go.

Do we need a permit for a kitchen?

It depends on the work. Moving walls, plumbing, gas or wiring typically needs one; a cosmetic refresh often doesn’t. We’ll tell you which applies and handle it when it does.

Can I choose my own cabinets, counters or appliances?

Yes. We can work from your selections or help you narrow them down. The written scope says who’s supplying what, so nothing falls between the cracks.

Can you move the sink or open a wall?

Often. It depends on what’s in the wall or under the floor, which is what the walkthrough is for. If a wall carries load, it can still come out with the right support; we’ll tell you what that involves before you decide.

How long does a kitchen take?

It depends on the scope and on lead times for cabinets and counters. You’ll get a schedule with the written scope, before anything starts.