The short version
- A good scope says what’s included, what isn’t, and what could change it.
- Look for materials and allowances, permits, the schedule, the payment schedule and how changes are handled.
- Vague words like “as needed” and “standard” deserve a question.
- If it isn’t written down, assume it isn’t included.
Most renovation disputes don’t start with bad work. They start with an assumption: the homeowner thought something was included, the contractor thought it wasn’t, and nobody wrote it down. A clear, written scope of work is the cheapest insurance against that.
Tennessee’s own advice to homeowners is to get a written contract covering the schedule, payment terms, change orders, cancellation and warranty. Here’s what a good scope covers, and what to ask when something’s missing.
What a good scope includes
Where the work is
The address, and exactly which rooms and areas are part of the job. “Kitchen” is a start; “kitchen, the adjoining half bath, and the hallway floor between them” is better.
The work itself, in plain language
Each part of the job described so you can picture it: what’s being removed, what’s being built, and what’s being replaced. Demolition, framing, electrical, plumbing, heating and cooling, insulation, drywall, flooring, cabinets, tile, paint and trim should each be accounted for if they’re part of the job.
Materials and allowances
Who supplies what, and what it is. Where you haven’t chosen something yet, such as tile or light fixtures, a scope usually carries an allowance: a set budget for that item. Ask what happens if you choose something that costs more or less than the allowance; the answer should be in writing.
What’s not included
Good scopes list exclusions as clearly as inclusions. Appliances, painting of rooms outside the work area, landscaping repairs and furniture moving are common ones. If you assume something is included, look for it by name.
Permits and inspections
Which permits the work needs, who will pull them, and when the inspections happen. The contractor should pull the permit. Be cautious if you’re asked to get it yourself, or told none is needed for work that clearly changes the structure, wiring or plumbing.
The schedule and order of work
A start date, the main stages, and an expected finish. A good schedule also says what could move it: material lead times, inspection availability, weather, or something found behind a wall.
The price and how it’s paid
The total price, and a payment schedule tied to stages of completed work rather than to dates on a calendar. Be wary of large payments before any work is done.
How changes are handled
Changes happen. A good scope says how: the change is described, priced and agreed in writing before the work is done. That’s what keeps a small change from becoming an argument at the end.
What happens with surprises
Older houses hide things: rot under a floor, old wiring behind a wall, water damage under tile. Ask how a surprise is handled. The answer you want is that you’re told, shown, given a price, and asked to agree before the work continues.
The site
Working hours, how the rest of the house is protected, where materials and the dumpster will go, daily cleanup, and what you’ll have access to during the work.
The warranty
What’s covered, for how long, and how to make a claim, in writing.
The finish
A final walkthrough together, and a punch list of anything that still needs attention before the job is called done.
Words that deserve a question
- “As needed” and “as required”: who decides, and how is it priced?
- “Standard” or “builder grade”: which product, exactly?
- “TBD”: what’s the allowance, and what happens if it’s exceeded?
- “Repair” without detail: repair how much, and to what standard?
Questions to ask while you read it
- Is everything we talked about on the walkthrough in here?
- What isn’t included that I might assume is?
- What could make this price change, and how would I find out?
- Which parts of the schedule depend on someone other than you?
- What do I need to decide, and by when?
How we write ours
Every job we take on starts with a walkthrough and a written scope: what’s included, what isn’t, and what could change it, before any work starts. If something behind a wall changes the plan, you hear about it and agree to it first. See how we work.
Sources
- Tips for Hiring a Contractor, Tennessee Department of Commerce and Insurance